News of the conflicts between the local population and the construction company involved in the construction of a small HPP in the Pankisi valley (Khadori 3) has recently made it into the headlines. Khadori is a small HPP with an installed capacity of 5.4 MW and an estimated annual generation of 27.5 mln. kWh. Construction of the Khadori 3 HPP started on 21 April, however, the local population resisted the project, and consequently, its company involved law enforcement officials to ensure its secure implementation.
In April 2019, Georgian power plants generated 966 mln. kWh of electricity. This represents a 9% decrease in total generation, compared to the previous year (in 2018, total generation in April was 1,064 mln. kWh). The decrease in generation on a yearly basis comes from the decrease in hydro and wind power generation (-21% and -27%), more than offsetting the increase in thermal power generation (+348%).
In February 2019, Georgian power plants generated 939 million kWh of electricity, which compared to the previous year represents a 0.5% increase in total generation. On the demand side, consumption amounted to 1,037 mln. kWh, a 2% decrease on an annual basis. Although the negative gap between generation and consumption decreased by 22% (from -126 to -98 mln. kWh), compared to the corresponding month of the previous year, it remained substantial.
In March 2019, Georgian power plants generated 974 mln. kWh of electricity. This represents a 2.2% decrease in total generation, compared to the previous year (in 2018, total generation in March was 997 mln. kWh.) The decrease in generation on a yearly basis comes from the decrease in hydro power generation (-30%), more than offsetting the increase in thermal and wind power generation (+98% and +42%).
Winter has always been a problem for the Georgian electricity system. Even though Georgia has plenty of hydropower, during this season several HPPs — seasonal and small — either stop or substantially reduce electricity generation. In this season, a significant share of hydropower generation comes from two large-scale state-owned pumped-storage HPPs: Enguri and Vardnili. However, exactly when the generation-consumption gap is the largest, most of the electricity produced is used to satisfy the consumption of the Abkhazia region, which on a yearly basis consumes as much electricity as Tbilisi, something we have mentioned in one of our previous articles.