Assessment of the project effect on incomes generated in small farmer families involved in the livestock rearing in Kakheti region. The overall objective of the assignment is to conduct cost-benefit and/or cost-effectiveness analysis together with the project team and identify monetary and nonmonetary benefits of interventions
APRC is working on a research to inform the Ministry of Environment and Natural Resources Protection of Georgia on the costs and benefits of climate change adaptation measures in agriculture of Georgia.
The objective of this study was to assess the economy wide indirect benefits of investments in the East West Highway (EWH). This study has used a computable general equilibrium (CGE) model, which simulates indirect benefits associated with the completion of the upgraded road corridor.
Cost-Benefit Analysis (CBA) is an economic tool for the comparison of costs and benefits associated with various alternatives. This tool is used to systematically estimate the strengths and weaknesses of different options of investing capital. It is a technique that is used to determine options that provide the best outcomes in terms of benefits in labor, time and cost savings etc.